Site Plan & Drainage Permit Guide for Georgia
Almost every building permit in Georgia requires a site plan showing grading, drainage, and stormwater management. Here's what you need to know.
What Is a Site Plan?
A site plan is a scaled drawing showing:
- Property boundaries and dimensions
- Building footprint and location
- Setbacks (front, side, rear)
- Driveway and parking
- Existing and proposed grading (elevations)
- Drainage patterns and stormwater management
- Utility connections
- Erosion control measures
- Trees and landscaping (where required)
When a PE-Stamped Site Plan Is Required
- New construction โ Residential and commercial
- Major additions โ That change the building footprint
- Commercial developments โ Always required
- Properties with drainage issues โ Sloped lots, flood zones
- Disturbed area over 1 acre โ Requires NPDES permit and erosion control plan
Drainage and Stormwater Requirements
Georgia requires that developments manage stormwater to prevent off-site impacts:
- Pre/post development matching โ Post-development runoff can't exceed pre-development
- Detention/retention โ May be required for larger developments
- Erosion control โ Silt fences, inlet protection, vegetation
- Downspout routing โ Must direct water away from foundations and property lines
Common Site Plan Issues
- Insufficient grading information โ Contours at 1-foot or 2-foot intervals
- Missing drainage flow arrows โ Show how water moves across the site
- No erosion control plan โ Required for disturbed areas
- Setback violations โ Building too close to property lines
- Missing utility easements โ Underground and overhead utilities must be shown
Georgia-Specific Requirements
- Georgia Erosion and Sedimentation Act โ Requires erosion control for land-disturbing activities
- Metropolitan North Georgia Water Planning District โ 15-county area with stricter stormwater rules
- Local watershed protection ordinances โ Vary by county
Getting Started
A properly prepared site plan speeds up permit approval and prevents drainage problems after construction.